Jaywick Sands
« Anti flood defence work starts soon »

Welcome Guest. Please Login or Register.
Sept 3, 2010, 1:25am




Jaywick Sands :: Regeneration? :: masterplan :: Anti flood defence work starts soon
   [Search This Thread][Send Topic To Friend] [Print]
 AuthorTopic: Anti flood defence work starts soon (Read 280 times)
iainburrit
Guest
 Anti flood defence work starts soon
« Thread Started on Jul 23, 2008, 7:19pm »

A Multi million Pound coastal defence scheme will start in Jaywick by September this year, with work taking place during winter, and finishing by the end of the year.
Some beach closures will be needed during the work.

Van Oord a Dutch company that will undertake the works will build a 185 metre offshore breakwater, designed to reduce the force of the waves hitting the coastline using 40,000 tonnes of rock, and recharging the beach with 250,000 cubic metres of sand.

It is hoped that further work on a inland water break that runs alongside the Martello Tower will be reinforced and made flood resistant, that being the inland physical barrier to floodwater to protect Brooklands and Grasslands in the future.
Link to Post - Back to Top  IP: Logged
Jacky
Administrator
*****
Jaywick is only place to live!
member is offline

[avatar]

Down boy!!!


[homepage]

Joined: Sept 2003
Gender: Female
Posts: 1,019
 Re: Anti flood defence work starts soon
« Reply #1 on Jul 25, 2008, 7:50pm »

Click here for history :)
Link to Post - Back to Top  IP: Logged

Sometimes It's better to say nothing and look a fool, than to open ones mouth and confirm it.
   [Search This Thread][Send Topic To Friend] [Print]

Click Here To Make This Board Ad-Free


This Board Hosted For FREE By ProBoards
Get Your Own Free Message Boards & Free Forums!
Terms of Service | Privacy Policy | Report Abuse | Mobile